Preliminary design, a rough shape, the 50/50 rail layout and finished shaping. Followed by a collaboration with artist Bryn Stevenson. Finally, fiberglassing over Bryn’s amazing spray can work.
Our friend Jocelyn took her camera out to Slocan Lake and got these great shots of her board. Built in 2011 and reconditioned for Jocelyn in 2016 with new side rails.